Tuesday, July 7, 2009

EB screws up..

So.. the stone benches on the vanity units in the bathrooms/powder rooms are supposed to be 40mm.. they had put in 20mm units.. they offered to give me $350 for the trouble to leave them as is.. I told them I want want is in the contract.. so they're replacing them this week hopefully..

The niches in the showers are non existent.. so that needs to be done as well.. I'm glad that I have been keeping an eye on all this.. the EB supervisor needs a supervisor.....

As a result of the above, the tiler hasn't been on site all week.. I guesstimate this has caused a two week delay at minimum, possibly three.